(click photos to expand)
Base trim being stained and poly'd

Vent grills, in-wall surround speakers and speaker grills being spray-painted to match walls

Even more base trim being finished, as well as completed cold-air return and furnace combustion-air vents spray painted and installed - makes this wall look better


I insulated the mechanical room walls and sheet-rocked over, not for insulation, but for noise-proofing. Lots of network work to do once the building is complete.

Bathroom tile and grouting work mostly complete. I need to clean up residual grout and then seal it.

Next up: Shopping for the bar countertop & sink, as well as the bath vanity top. After that, the final major work is getting flooring installed.