The playroom all lit up nice and bright for the kids....

Breaker box - not yet complete.....

Much better than before....


Receptacles boxes & wiring....

Wiring to the bar, and the Hot and Cold H2O PEX run to where the sink will be....

Another view....note the sink drain is also installed

Better view of the bar/kitchenette sink drain...

Bathroom sink drain is now run to the vent stack (yes, there is enough slope. I even tested it...)

THIS is why you SCREW the walls together and do not use nails!!!!! My PEX Crimping tool could not fit properly in between the studs to attach the bathroom H2O runs to....so I just moved the stud.......

All better now......these are the H2O runs to the bathroom sink and toilet

Next week the rest of the wiring (hooking up the new lines to the breaker box, and the UTS) will be complete. I am re-thinking my home theather low-voltage wiring runs. My current plan is just crazy expensive, and might not even work. Back to the drawing board.
Also, have a new door on order.......